2020-016 Notre Dame HS Universal washroom renovation

Closing Date: March 31, 2020

Project Description

McDonald Brothers Construction would like to invite you to bid on this tender.

The project is to modify an existing washroom and hallway for a new Universal washroom with shower. The scope of work need to be finish by July 21, 2020. trades required but not limited to is: selective demolition, steel door and frames, door hardware, Door operator drywall, ceramic tiling, terrazzo flooring, painting, washroom accessories, Plumbing, Sprinklers, HVAC, Electrical, Emergency call system

The tender is closing March 31 before 3:00 pm

Addendum # 1 as been posted and site pictures

Closing:

March 31st 2020 before 03:00:00

Site visit:

No Site visit was schedule
Please login to access downloads

Project Division required

  • Division 01 General Requirements - 0101 Document Reproduction
  • Division 02 Existing Conditions - 0202 Selective Demolition
  • Division 08 Openings - 0801 Steel Doors & Frames
  • Division 08 Openings - 0805 Automatic Door Operators
  • Division 08 Openings - 0806 Door Hardware
  • Division 09 Finishes - 0901 Gypsum Board & Ceiling
  • Division 09 Finishes - 0902 Ceramic Tile
  • Division 09 Finishes - 0905 Painting
  • Division 10 Specialities - 1001 Washroom Accessories
  • Division 21 Fire Suppression - 2100 Fire Suppression
  • Division 22 Plumbing - 2200 Plumbing - Gas - Hydronic
  • Division 22 Plumbing - 2201 Plumbing Suppliers
  • Division 23 H.V.A.C. - 2300 HVAC
  • Division 26 Electrical - 2600 Electrical
  • Division 27 Communication - 2700 Communication

Only Registered Contractors Can Bid On Projects.