2020-019 St Patrick High School Classroom Renovation

Closing Date: April 9, 2020

Project Description

McDonald Brothers Construction would like to invite you to bid on this tender to modify an existing classroom. The scope of work need started tentative July 2 and to be finish by august 15, 2020. trades required but not limited to is: selective demolition, millwork, steel door and frames, wood door, door hardware, drywall, resilient flooring, painting, Plumbing, Sprinklers, HVAC, Electrical, communication

Addenda: #1 now posted.

Closing:

April 9th 2020 before 03:00:00

Site visit:

No Site visit schedule
Please login to access downloads

Project Division required

  • Division 01 General Requirements - 0101 Document Reproduction
  • Division 02 Existing Conditions - 0202 Selective Demolition
  • Division 06 Wood Plastics and Composites - 0601 Rough Carpentry
  • Division 06 Wood Plastics and Composites - 0602 Millwork & Cabinetry
  • Division 08 Openings - 0801 Steel Doors & Frames
  • Division 08 Openings - 08011 Door instalation
  • Division 08 Openings - 0802 Wood Doors
  • Division 08 Openings - 0804 Curtain Wall & Windows
  • Division 08 Openings - 0806 Door Hardware
  • Division 09 Finishes - 0901 Gypsum Board & Ceiling
  • Division 09 Finishes - 0903 Resilient Flooring
  • Division 09 Finishes - 0905 Painting
  • Division 22 Plumbing - 2200 Plumbing - Gas - Hydronic
  • Division 23 H.V.A.C. - 2300 HVAC
  • Division 26 Electrical - 2600 Electrical
  • Division 27 Communication - 2700 Communication
  • Division 28 Electronic Safety & Security - 2800 Electronic Safety & Security

Only Registered Contractors Can Bid On Projects.