2020-071 Las Brisas Condo Lobby Remodel & chair Lift

Closing Date: January 29, 2021

Project Description

MBC would like to invite you to bid on the following tender:

This project includes: Abatement, Selective Demolition,  stainless steel railings, wood baseboards, steel Frames & doors, curtain wall entrance, Door operators, hardware, Gypsum, Ceramic tile, Carpet, Painting, site furnishings, entrance floor grill, wheelchair lift, Electrical & Alarm.

NEW Closing January 29th at 14:59pm

Please note pre-qualified Curtain wall & Wheelchair lift contractors.

Closing:

January 29th 2021 before 02:59:00
Please login to access downloads

Project Division required

  • Division 01 General Requirements - 0101 Document Reproduction
  • Division 02 Existing Conditions - 0202 Selective Demolition
  • Division 02 Existing Conditions - 0203 Hazardous Material Abatement
  • Division 05 Metals - 0502 Metal Fabrication
  • Division 05 Metals - 0503 Non-Ferrous Metal Fabrication
  • Division 06 Wood Plastics and Composites - 0602 Millwork & Cabinetry
  • Division 08 Openings - 0801 Steel Doors & Frames
  • Division 08 Openings - 0805 Automatic Door Operators
  • Division 08 Openings - 0806 Door Hardware
  • Division 08 Openings - 0813 Security Films
  • Division 09 Finishes - 0901 Gypsum Board & Ceiling
  • Division 09 Finishes - 0902 Ceramic Tile
  • Division 09 Finishes - 0904 Carpet Flooring
  • Division 09 Finishes - 0905 Painting
  • Division 10 Specialities - 1008 Wall Protection
  • Division 14 Conveying Equipment - 1401 Wheelchair Lifts
  • Division 26 Electrical - 2600 Electrical
  • Division 26 Electrical - 2601 Electrical Suppliers

Only Registered Contractors Can Bid On Projects.