2022-049 Queensway Carleton Hopsital MRI Chiller Replacement

Closing Date: October 4, 2022

Project Description

Good afternoon,

Addendums 1,2,3,4,5 & 6 now available

MBC would like to invite you to bid on the flowing tender of replacing 1 MRI Chiller with the chiller provided by the client.

This tender will include: Selective demolition, Abatement, Metal Fabrication, mod bit roofing/patching, Metal; Siding Repair, Plumbing, HVAC, Controls, Electrical.

NEW Closing Date: October 4th 2022 before 2:00pm

NEW: Pre-Qualified Roofers list

Estimator: Mark@mbc.ca

Please send all questions to the GC and not the consultant.

Closing:

October 4th 2022 before 12:13:59

Site visit:

September 15th 2022 at 10 am.
Please login to access downloads

Project Division required

  • Division 01 General Requirements - 0101 Document Reproduction
  • Division 02 Existing Conditions - 0202 Selective Demolition
  • Division 02 Existing Conditions - 0203 Hazardous Material Abatement
  • Division 05 Metals - 0502 Metal Fabrication
  • Division 07 Thermal and Moisture Protection - 0706 Membrane Roofing
  • Division 07 Thermal and Moisture Protection - 0708 Metal Roofing & Siding
  • Division 22 Plumbing - 2200 Plumbing - Gas - Hydronic
  • Division 22 Plumbing - 2201 Plumbing Suppliers
  • Division 23 H.V.A.C. - 2300 HVAC
  • Division 23 H.V.A.C. - 2302 Mechanical Suppliers
  • Division 25 Integrated Automation - 2500 Integrated Automation
  • Division 26 Electrical - 2600 Electrical
  • Division 26 Electrical - 2601 Electrical Suppliers

Only Registered Contractors Can Bid On Projects.