Project Description
McDonald Brothers Construction Inc. would like to invite you to bid on Smith Falls Public Library Renovation.
The project is but not limited to renovate the existing library, adding a new elevator and providing an addition at the second floor, adding new washrooms and interior finishes. The addition is a mixed of Wood framing with structural steel structure. New plumbing and HVAC distribution for the renovations. Complete with new electrical distribution and lights. Construction Completion November 2024.
Please see the tender for for units prices for Separates prices, Units rates and labor rates. This is needed at time of tender.
The Tender is closing October 5th before 4:00 pm
Please forward all questions to: Estimator: Larry Saumure at Larry@mbc.ca
Send all quotes to tenders@mbc.ca and please send 15 min before closing. Any received afterwards may not be accepted.
Note that MBC is signatory to the Carpenters’ Union (ICI and Residential Sectors).
As such, trades bidding on work claimed by the Carpenters’ Union must be signatory or provide unionized labor in their quotes.
Closing:
October 5th 2023 before 04:00:00Site visit:
A non mandatory site visit is schedule for, on September 21th at 10:00 am at 81 Beckwith St N. Smith falls at the LibraryProject Divisions required
- Division 01 General Requirements - 0101 Document Reproduction
- Division 02 Existing Conditions - 0202 Selective Demolition
- Division 03 Concrete Work - 0302 Reinforcing Steel
- Division 04 Masonry - 0400 Masonry
- Division 05 Metals - 0501 Structural Steel
- Division 05 Metals - 0502 Metal Fabrication
- Division 06 Wood Plastics and Composites - 0601 Rough Carpentry
- Division 06 Wood Plastics and Composites - 0602 Millwork & Cabinetry
- Division 06 Wood Plastics and Composites - 0604 Engineered Joists & Trusses
- Division 07 Thermal and Moisture Protection - 0702 Sprayed Insulation
- Division 07 Thermal and Moisture Protection - 0703 Blown Insulation
- Division 07 Thermal and Moisture Protection - 0706 Membrane Roofing
- Division 07 Thermal and Moisture Protection - 0707 Shingle Roofing
- Division 07 Thermal and Moisture Protection - 0708 Metal Roofing & Siding
- Division 07 Thermal and Moisture Protection - 0717 Eavesthroughing
- Division 08 Openings - 0801 Steel Doors & Frames
- Division 08 Openings - 0802 Wood Doors
- Division 08 Openings - 0804 Curtain Wall & Windows
- Division 08 Openings - 0815 Door Installation
- Division 09 Finishes - 0901 Gypsum Board & Ceiling
- Division 09 Finishes - 0902 Ceramic Tile
- Division 09 Finishes - 0903 Resilient Flooring
- Division 09 Finishes - 0904 Carpet Flooring
- Division 09 Finishes - 0905 Painting
- Division 10 Specialities - 1001 Washroom Accessories
- Division 10 Specialities - 1002 Toilet Partitions
- Division 14 Conveying Equipment - 1401 Wheelchair Lifts
- Division 22 Plumbing - 2200 Plumbing - Gas - Hydronic
- Division 22 Plumbing - 2201 Plumbing Suppliers
- Division 23 H.V.A.C. - 2300 HVAC
- Division 23 H.V.A.C. - 2301 Refrigeration
- Division 23 H.V.A.C. - 2302 Mechanical Suppliers
- Division 25 Integrated Automation - 2500 Integrated Automation
- Division 26 Electrical - 2600 Electrical
- Division 26 Electrical - 2601 Electrical Suppliers
- Division 27 Communication - 2700 Communication