22-015 St Mary’s Coptic Orthodox Church Expansion Ottawa Package # 01

Closing Date: May 24, 2023

Project Description

The St. Mary’s Coptic Orthodox Church has retained MBC as their Construction Manager to oversee their building expansion at 1 Canfield Road, Nepean.

Tender Package-01

Addendum #1, #2,3 and Addendum #4 has been posted on MBC portal to view 

New closing Date May 24th before 3:00 pm

The church addition, known as the Community Center/Service Building, is built on the North side of the church and will link through to the existing North stairwell at both levels. The three level addition is approximately 3,231 m2 of floor area and includes offices, meeting rooms, gymnasium, and commercial kitchens. The site plan and services will be altered throughout the property to include new storm, sanitary, hydro and gas services. Along with revisions to the road access point, parking, walkways, landscaping, and fencing.

The scope of work include, but not limited to:

  • Removal and disposal of asphalt paving, grubbing, tree removals, excavation and backfill for addition, site services to 1 meter inside building with sleeve, gasket, and pipe

                        Units price required for: See Appendix A

  • Supply and installation of shoring
  • Supply and installation of site services
  • New concrete curbs and sidewalks, concrete pads, and asphalts paving including line painting
  • Supply and installation of formwork
  • Supply and installation of reinforcing steel
  • Supply cast in place concrete
  • Concrete finishing
  • Waterproofing

Please email all questions to larry@mbc.ca

Closing:

May 24th 2023 before 02:59:00

Site visit:

Bidders are encouraged to visit the premises to familiarize themselves with the existing conditions before the date of the tender closing and in advance to submitting a bid. A site visit was schedule for Friday April 28 at 10:00 am. Please note No questions will be answered at the site visit. Please email all questions to larry@mbc.ca
Please login to access downloads

Project Divisions required

  • Division 01 General Requirements - 0101 Document Reproduction
  • Division 03 Concrete Work - 0301 Formwork
  • Division 03 Concrete Work - 0302 Reinforcing Steel
  • Division 03 Concrete Work - 0303 Slab Finishing
  • Division 07 Thermal and Moisture Protection - 0701 Waterproofing
  • Division 31 Earthwork - 3100 Earthwork
  • Division 31 Earthwork - 3101 Clearing & Grubbing
  • Division 31 Earthwork - 3102 Shoring & Underpinning
  • Division 31 Earthwork - 3104 Piles & Caissons
  • Division 32 Exterior Improvements - 3201 Asphalt - Curbs - Sidewalks
  • Division 33 Utilities - 3300 Utilities & Site Services

Only Registered Contractors Can Bid On Projects.