Project Description
Tender invitation E26-015 Half Moon Bay HS Pre-Loading, Ottawa
MBC is pleased to invite you to submit a bid for the Half Moon bay HS Pre-loading project.
Design and Installation of Wick Drain and Preload (grade raise to Finished floor elevation and surcharge) system of building footprint and 5 m beyond in all directions
to allow the construction of the slab of the proposed school as slab on grade and proposed grade raise. The soil improvement measures that allow for the slab loads and for the cut and fill required for the finished grades shown in the contract.
Please note:. There is a Performance Holdback of the amount of 20% of the total Tender sum. This will be held back until the soil’s improvements have reached the specified bearing capacity.
CLOSING DATE
May 26th 2026 before 03:00:00ADDENDA
The latest addendum #1 is available for download.SITE VISIT
Trades are responsible to familiarized them self with the site and it’s surrounding’s
Please direct any questions to tenders@mbc.ca. Do not send any questions directly to the client or consultant. MBC is signatory to the Carpenters’ Union (ICI and Residential Sectors). Trades bidding on work claimed by the Carpenters’ Union must be signatory or provide unionized labour in their quotes.
Project Divisions required
- 01 - General Requirements
- 01 11 00 Document Reproduction
- 01 32 23 Surveying Services
- 31 - Earthwork
- 31 00 00 Earthwork
- 31 32 00 Soil Stabilization
- 31 40 00 Shoring and Underpinning
- 31 60 00 Piles and Caissons