This project was completed in 2 separate phases. Phase 1 involved the renovation of Towers A & B which totaled construction on 52 floors. The scope of work consisted of the revitalization of corridors and common areas throughout the floors and saw the painting of door frames along with the installation of new hardware on the doors, new wood trims, floor finishes, vinyl wall coverings, ceiling fit-ups, and the rehabilitation of light fixtures. Phase 2 of this project was a renovation to the 1500 square foot lobby on the ground floor of the condominium tower at 1500 Riverside Drive in Ottawa. The scope of work included redoing finishes, new doors & hardware, storefront curtainwall, specialized millwork, and mechanical & electrical systems. The replacement of doors and windows was also part of the project. Additionally, the condominium was expected to remain open throughout the duration of construction on both phases. As a result, a phased approach was implemented to complete work during non-peak hours, with the intent to not disrupt the building’s tenants.