Project Description
Tender invitation 2024-024 CHEO Newborn Consolidation and Expansion
MBC would like to invite you to bid on the following project scope includes a full slab to slab demolition of approximately 22,000 sq. ft. 2nd floor of the Max Keeping Wing of the Hospital, excluding the existing washrooms, data room and electrical rooms which will remain. Refer to attachment: Preliminary Design Package. The project will include the fit up of new lab space including modification or additions to the below systems:
New backup generator fed off a new natural gas supply and new UPS., New dedicated RTU and HRU complete with humidification for new lab space. New dedicated lab exhaust system including +/- 10 new fume hoods. Replacement of heat exchangers. Change from HWT to instantaneous hot water supply, including new heat exchangers. New reverse osmosis water system and new clinical lab grade water system. Three new universal washrooms. New pre-action sprinkler system for lab spaces. New prefab walk-in fridge & freezer. New medical gas distribution. Replacement of existing roof and modifications/ additions required for new roof top equipment
- Please review Addendum #7 and addendum #8 . -New Closing Date January 31, 2025
Bid validity period 120 days
CLOSING DATE
January 31st 2025 before 02:00:00ADDENDA
The latest addendum #8 is available for download.SITE VISIT
A Non Mandatory site visit is schedule for the trades on December 3 at 14:00 pm. for the site visit scheduled on December 3rd, all Subcontractors must wear PPE.
Meet at the entrance of the Max Keeping Wing at 401 Smyth rd on the second floor
BID FORM
Please see the Appendices 5 form for prices required at time of tender.
Click here to see the appendix 5 form
Please direct any questions to tenders@mbc.ca. Do not send any questions directly to the client or consultant. MBC is signatory to the Carpenters’ Union (ICI and Residential Sectors). Trades bidding on work claimed by the Carpenters’ Union must be signatory or provide unionized labour in their quotes.
Please login to access downloads
Project Divisions required
- 01 - General Requirements
- 01 11 00 Document Reproduction
- 01 91 00 Commissioning and Reporting
- 02 - Existing Conditions
- 02 41 19 Selective Demolition
- 05 - Metals
- 05 12 00 Structural Steel
- 05 50 00 Metal Fabrication
- 06 - Wood, Plastics, and Composites
- 06 40 00 Millwork and Cabinetry
- 07 - Thermal and Moisture Protection
- 07 21 29 Sprayed Insulation
- 07 50 00 Membrane Roofing
- 07 92 00 Sealant
- 08 - Openings
- 08 10 00 Door Installation
- 08 11 00 Steel Doors and Frames
- 08 14 00 Wood Doors
- 08 40 00 Curtain Wall and Windows
- 08 71 00 Door Hardware
- 08 71 13 Automatic Door Operators
- 08 87 23 Security Films
- 09 - Finishes
- 09 20 00 Gypsum Board and Ceiling
- 09 65 00 Resilient Flooring
- 09 80 00 Acoustic Treatment
- 09 91 00 Painting
- 09 96 56 Epoxy Coatings
- 10 - Specialties
- 10 28 00 Washroom Accessories
- 10 51 00 Lockers
- 11 - Equipment
- 11 53 00 Laboratory Equipment
- 11 70 00 Healthcare Equipment
- 12 - Furnishings
- 12 35 53 Laboratory Equipment and Casework
- 21 - Fire Suppression
- 21 10 00 Fire Suppression
- 22 - Plumbing
- 22 10 00 Plumbing - Gas - Hydronic
- 22 30 00 Plumbing Suppliers
- 23 - H.V.A.C.
- 23 00 00 HVAC
- 23 60 00 Refrigeration
- 23 70 00 Mechanical Suppliers
- 26 - Electrical
- 26 00 00 Electrical
- 26 00 01 Electrical Suppliers