Project Description
Tender invitation 23-007 Salus Athlone Renovation
MBC would like to invite you to bid on the following project scope includes a renovation of a 5 storey low income housing.
The client has retained MBC to act as their Construction Manager for the construction of a new affordable housing apartment building located in Ottawa. The scope of work involves the renovation of a the 4-storey, 39 units residential building built in 2006 located at 2000 Scott Street, Ottawa, ON that also borders on Athlone Avenue recently. The building suffered extensive damage to interior finishes due to a burst sprinkler pipe in February 2023. The interior finishes of the water-damaged areas were substantially removed by specialized restorations firms, leaving the building structure framing and exterior wall cladding. Some interior finishes remain on parts of the top floor, however most interior walls on all floors have had some part of or all the existing wall finish removed. Mechanical and electrical systems are intact, except for much of the ducting, diffusers, plumbing fixtures, lights, and wall-mounted devices with the affected spaces, which have been removed.
Please see the Appendix “A” for Itemized prices to be provides at time of tender.
CLOSING DATE
December 12th 2024 before 03:00:00ADDENDA
The latest addendum #1 is available for download.SITE VISIT
A site visit is schedule on Monday December 2 at 9:00 am. This site visit is highly recommended for the trades to view the site conditions and access. All persons attending the site visit needs to have the personal protective equipment (PPE). Parking on site is very limited. Parking is available at the surrounding roads
BID FORM
Please see the Itemized price form for prices required at time of tender.
Click here to see the Itemized price form
Please direct any questions to tenders@mbc.ca. Do not send any questions directly to the client or consultant. MBC is signatory to the Carpenters’ Union (ICI and Residential Sectors). Trades bidding on work claimed by the Carpenters’ Union must be signatory or provide unionized labour in their quotes.
Project Divisions required
- 01 - General Requirements
- 01 11 00 Document Reproduction
- 02 - Existing Conditions
- 02 41 19 Selective Demolition
- 03 - Concrete Work
- 03 35 00 Slab Finishing
- 03 80 00 Concrete Cutting and Coring
- 05 - Metals
- 05 50 00 Metal Fabrication
- 06 - Wood, Plastics, and Composites
- 06 40 00 Millwork and Cabinetry
- 07 - Thermal and Moisture Protection
- 07 81 00 Sprayed Fireproofing and Intumescent
- 07 92 00 Sealant
- 08 - Openings
- 08 10 00 Door Installation
- 08 11 00 Steel Doors and Frames
- 08 14 00 Wood Doors
- 08 40 00 Curtain Wall and Windows
- 08 71 00 Door Hardware
- 08 71 13 Automatic Door Operators
- 09 - Finishes
- 09 30 00 Ceramic Tile
- 09 65 00 Resilient Flooring
- 09 68 00 Carpet Flooring
- 09 91 00 Painting
- 10 - Specialties
- 10 14 00 Signage
- 10 22 39 Operable Partitions
- 10 26 00 Wall Protection
- 10 28 00 Washroom Accessories
- 12 - Furnishings
- 12 20 00 Window Covering
- 12 36 40 Stone Countertops
- 22 - Plumbing
- 22 10 00 Plumbing - Gas - Hydronic
- 22 30 00 Plumbing Suppliers
- 23 - H.V.A.C.
- 23 00 00 HVAC
- 23 70 00 Mechanical Suppliers
- 26 - Electrical
- 26 00 00 Electrical
- 26 00 01 Electrical Suppliers
- 27 - Communications
- 27 00 00 Communications