Project details

In 2012, the Government of Canada’s Department of National Defense acquired new aircraft and military equipment, as well as individuals to operate the new technology. As a result, this new facility was designed to support the personnel involved in the helicopter program.

The building is 63,000 ft2 on three floors above grade with a full basement and storage facilities. The scope of work includes load bearing masonry walls with structural steel components and core-slab floor assemblies.